2021 wholesale price Fujitsu Hydraulic Pump - piston for concrete pump spare parts – CCMIE

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Being supported by an highly developed and skilled IT group, we could offer you technical support on pre-sales & after-sales support for Sany Reach Stacker Spare Parts, Komatsu Dozer Gear Bearing, Komatsu Excavator Gear Shaft, Our merchandise are new and previous prospects consistent recognition and trust. We welcome new and outdated shoppers to contact us for long term small business relations, common advancement. Let's speeding within the dark!
2021 wholesale price Fujitsu Hydraulic Pump - piston for concrete pump spare parts – CCMIE Detail:

piston

Because there are many kinds of spare parts, we can’t display them all on the website. Please feel free to contact us for specific ones

advantage

1. We supply both original and aftermarket products for you
2. From the manufacturer to the customer directly, saving your cost
3. Stable stock for normal parts
4. In Time Delivery Time, with competitive shipping cost
5. Professional and on time after service

Packing  

Carton Boxes, or according to clients’ request.

description

The piston of the concrete pump truck is a vulnerable part, and it can be up to 2-3 million cubic meters of concrete under normal conditions.

What factors may shorten the life of the piston?

1. The piston and the expansion cylinder are not on the same axis

This is mainly a problem during assembly. The booster cylinder and the piston have not been calibrated by the axis. The main failure phenomenon is the partial wear of the piston, and the bending and wear of the piston lip is more serious, but this will only appear on the new car. If this problem only occurs after you recently replaced the jack cylinder, it means that the coaxiality of the jack cylinder and the piston is alternated. It may be that the coaxiality was not calibrated during installation, so you need to recalibrate the coaxiality of the two. A piston or a pressurized cylinder is not good and will reduce all overlaps. Therefore, those who have changed the pressurized cylinder must remember to check the working conditions of the piston. Once you find that concrete has run into the water tank, you should check it immediately.

2. Lubrication system failure

The concrete cylinder will lubricate the piston on the side close to the water tank. Generally, grease or hydraulic oil is used as a lubricant. If you find that the piston is worn out, if you find that there is no grease on the piston or there are scratches on the piston surface after removing the piston, it means the lubrication system No job, what is the reason for the investigation? Check for lack of lubricating oil? Is the grease label (generally 00#, winter 000#) used correctly? Check whether the lubricating pump is working and whether the oil circuit is blocked. You can remove the lubricating oil pipe to see if there is any leakage of lubricating oil. As long as one lubrication point is blocked in the progressive diverter used on the pump truck, the other working points will not work. Therefore, once the fault of the lubrication system is checked, it needs to be eliminated one by one until all the lubrication points are out of oil.

3. Hydraulic system failure

Another point is difficult to think of, that is, the piston stroke is not in place, and the lubricating grease does not reach the piston. Check whether the supplementary oil is working properly. The stroke switch sensors in the water tank are one after the other. If they are found to be on the same horizontal line, adjust immediately. , And the other is to jog the piston to see if the proximity switch sensor can sense that the piston is in place. You can rotate the adjustment nut of the travel switch sensor to adjust the up and down position, so that it can sense whether the piston is in place.

4. Pistons of inferior materials are used

Many people are eager to be cheap and buy some pistons that use inferior materials. Due to the poor wear resistance of the materials, the service life of the piston will be greatly reduced. This will lead to frequent replacement of the piston.

Finally, remind everyone that piston replacement must be in accordance with safe operating procedures, do not reach into the water tank or concrete cylinder, and the displacement of the pump truck must be adjusted to the lowest when operating, and the pump truck must be turned off during the disassembly process.

Our-warehouse1

Our-warehouse1

Pack and ship

Pack and ship

Product detail pictures:

2021 wholesale price   Fujitsu Hydraulic Pump  - piston for concrete pump spare parts – CCMIE detail pictures

2021 wholesale price   Fujitsu Hydraulic Pump  - piston for concrete pump spare parts – CCMIE detail pictures


Related Product Guide:

The very rich projects management experiences and one to one service model make the high importance of business communication and our easy understanding of your expectations for 2021 wholesale price Fujitsu Hydraulic Pump - piston for concrete pump spare parts – CCMIE , The product will supply to all over the world, such as: San Francisco, Germany, Nepal, We hope we can establish long-term cooperation with all of the customers, and hope we can improve competitiveness and achieve the win-win situation together with the customers. We sincerely welcome the customers from all over the world to contact us for anything you need!Welcome all customers both at home and abroad to visit our factory. We hope to have win-win business relationships with you, and create a better tomorrow.
Good quality, reasonable prices, rich variety and perfect after-sales service, it's nice!
5 Stars By Jonathan from Riyadh - 2018.07.26 16:51
The company's products can meet our diverse needs, and the price is cheap, the most important is that the quality is also very nice.
5 Stars By Nick from Malaysia - 2017.11.20 15:58
Write your message here and send it to us