Chinese Professional Takeuchi Tb175 Hydraulic Pump - delivery cylinder for concrete pump spare parts – CCMIE

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

With our excellent administration, strong technical capability and strict excellent control method, we carry on to offer our clients with responsible good quality, reasonable costs and great companies. We intention at becoming considered one of your most responsible partners and earning your pleasure for Shantui Bulldozer Track Pad, Komatsu Pc450-7 Excavator Hydraulic Pump, Dongfeng Cummins Engine Parts, We welcome new and aged buyers from all walks of daily life to get hold of us for upcoming business enterprise interactions and acquiring mutual good results!
Chinese Professional Takeuchi Tb175 Hydraulic Pump - delivery cylinder for concrete pump spare parts – CCMIE Detail:

delivery cylinder

Because there are many kinds of spare parts, we can’t display them all on the website. Please feel free to contact us for specific ones

advantage

1. We supply both original and aftermarket products for you
2. From the manufacturer to the customer directly, saving your cost
3. Stable stock for normal parts
4. In Time Delivery Time, with competitive shipping cost
5. Professional and on time after service

Packing  

Carton Boxes, or according to clients’ request.

description

The Features for Delivery Cylinder/ Concrete Cylinder Pipe:
1. Durable cylinder is made of high quality carbon steel Hardness >HRC64
2. Use advanced chromium plating process for inner wall, 0.26-0.33 mm super-thick chromium plating layer
3. Unique structure design on both ends of the flange, sharply increased the assembly precision and strength of the concrete cylinder key stress cross section structure

The Specifications for Delivery Cylinder/ Concrete Cylinder Pipe

Product Name Concrete Pump Parts Delivery Cylinder/ Cylinder Pipe
Brand Zoomlion
Material Quality steel + Super thick chromium plating
Model Number DN200 DN230 DN260
Product Code Φ200 x 1960 Φ230 x 2250 Φ260X2250
Cylinder Diameter Φ200mm Φ230 Φ260
Length 1960mm 2250mm 2250mm
Chrome plate layer thickness 0.25-0.3mm 0.25~0.3mm 0.26-0.33mm
Hardness on chromium plating surface >HRC64 >HRC64 >HRC64
Service Life 100,000m³ 100,000m³ 100,000m³
Application Zoomlion Φ200×1960 Trailer Concrete Pump Zoomlion Φ230×2250 Low-Emission Truck-mounted Concrete boom Pump Zoomlion Φ260×2250 High-Emission Truck-mounted Concrete Boom Pump


Maintenance of the pumping part

1. Check the oil quality and oil level of the hydraulic oil every 8 hours when the pump truck is working, and replenish and replace it if necessary. The newly added hydraulic oil must have the same grade as the oil in the tank. The pump truck is filled with hydraulic pressure before leaving the factory. The oil is Esso H46. Generally, when pumping 20,000 cubic meters of concrete or using it for half a year, the oil should be completely changed once. When changing the oil, the oil tank must be cleaned and the oil tanks of each part must be drained;

2. Check the oil level of the lubricating oil every 8 hours when the pump truck is working. It is recommended to use non-extreme pressure type semi-fluid lithium base grease. When pumping, there should be places where the concrete cylinder is connected to the water tank, the bearing seat of the S tube and the mixing end seat. Lubricating oil overflow;

3. After the pump truck has pumped 3000 cubic meters, the gap between the glasses plate and the cutting ring should be adjusted. If it is severely worn, it must be replaced immediately. Check that the concrete should be well sealed and no mortar seeped into the water tank;

4. After the pump truck is used for 500 hours, check the wear condition of the S tube and the bearing position of the S tube, and replace the shaft sleeve and taper sleeve if necessary;

5. Check the indication of the vacuum gauge of the suction filter of the pump truck. If the pointer of the vacuum gauge reaches the red area (that is, it exceeds 0.04Mpa), the filter element must be replaced;

6. Each system must be checked when starting up, check whether the system pressure is normal, and check whether the hydraulic system is leaking;

Our-warehouse1

Our-warehouse1

Pack and ship

Pack and ship

Product detail pictures:

Chinese Professional  Takeuchi Tb175 Hydraulic Pump  - delivery cylinder for concrete pump spare parts – CCMIE detail pictures

Chinese Professional  Takeuchi Tb175 Hydraulic Pump  - delivery cylinder for concrete pump spare parts – CCMIE detail pictures


Related Product Guide:

Well-run devices, expert profits group, and better after-sales companies; We have been also a unified huge family, everybody keep on with the organization worth "unification, determination, tolerance" for Chinese Professional Takeuchi Tb175 Hydraulic Pump - delivery cylinder for concrete pump spare parts – CCMIE , The product will supply to all over the world, such as: Slovenia, The Swiss, London, We have a good reputation for stable quality products, well received by customers at home and abroad. Our company would be guided by the idea of "Standing in Domestic Markets, Walking into International Markets". We sincerely hope that we could do business with customers both at home and abroad. We expect sincere cooperation and common development!
The company has rich resources, advanced machinery, experienced workers and excellent services, hope you keep improving and perfecting your products and service, wish you better!
5 Stars By Hedy from Philadelphia - 2017.01.28 19:59
The company's products very well, we have purchased and cooperated many times, fair price and assured quality, in short, this is a trustworthy company!
5 Stars By Frederica from Auckland - 2018.12.05 13:53
Write your message here and send it to us