Chinese wholesale Hyundai R290lc-7 Hydraulic Pump - piston for concrete pump spare parts – CCMIC

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Our company sticks to the principle of "Quality is the life of the company, and reputation is the soul of it" for Liugong Wheel Loader Spare Parts, Komatsu D31 Transmission, Komatsu D20p Dozer Parts, Clients to start with! Whatever you require, we should do our utmost to aid you. We warmly welcome prospects from everywhere in the entire world to cooperate with us for mutual enhancement.
Chinese wholesale Hyundai R290lc-7 Hydraulic Pump - piston for concrete pump spare parts – CCMIC Detail:

piston

Because there are many kinds of spare parts, we can’t display them all on the website. Please feel free to contact us for specific ones

advantage

1. We supply both original and aftermarket products for you
2. From the manufacturer to the customer directly, saving your cost
3. Stable stock for normal parts
4. In Time Delivery Time, with competitive shipping cost
5. Professional and on time after service

Packing  

Carton Boxes, or according to clients’ request.

description

The piston of the concrete pump truck is a vulnerable part, and it can be up to 2-3 million cubic meters of concrete under normal conditions.

What factors may shorten the life of the piston?

1. The piston and the expansion cylinder are not on the same axis

This is mainly a problem during assembly. The booster cylinder and the piston have not been calibrated by the axis. The main failure phenomenon is the partial wear of the piston, and the bending and wear of the piston lip is more serious, but this will only appear on the new car. If this problem only occurs after you recently replaced the jack cylinder, it means that the coaxiality of the jack cylinder and the piston is alternated. It may be that the coaxiality was not calibrated during installation, so you need to recalibrate the coaxiality of the two. A piston or a pressurized cylinder is not good and will reduce all overlaps. Therefore, those who have changed the pressurized cylinder must remember to check the working conditions of the piston. Once you find that concrete has run into the water tank, you should check it immediately.

2. Lubrication system failure

The concrete cylinder will lubricate the piston on the side close to the water tank. Generally, grease or hydraulic oil is used as a lubricant. If you find that the piston is worn out, if you find that there is no grease on the piston or there are scratches on the piston surface after removing the piston, it means the lubrication system No job, what is the reason for the investigation? Check for lack of lubricating oil? Is the grease label (generally 00#, winter 000#) used correctly? Check whether the lubricating pump is working and whether the oil circuit is blocked. You can remove the lubricating oil pipe to see if there is any leakage of lubricating oil. As long as one lubrication point is blocked in the progressive diverter used on the pump truck, the other working points will not work. Therefore, once the fault of the lubrication system is checked, it needs to be eliminated one by one until all the lubrication points are out of oil.

3. Hydraulic system failure

Another point is difficult to think of, that is, the piston stroke is not in place, and the lubricating grease does not reach the piston. Check whether the supplementary oil is working properly. The stroke switch sensors in the water tank are one after the other. If they are found to be on the same horizontal line, adjust immediately. , And the other is to jog the piston to see if the proximity switch sensor can sense that the piston is in place. You can rotate the adjustment nut of the travel switch sensor to adjust the up and down position, so that it can sense whether the piston is in place.

4. Pistons of inferior materials are used

Many people are eager to be cheap and buy some pistons that use inferior materials. Due to the poor wear resistance of the materials, the service life of the piston will be greatly reduced. This will lead to frequent replacement of the piston.

Finally, remind everyone that piston replacement must be in accordance with safe operating procedures, do not reach into the water tank or concrete cylinder, and the displacement of the pump truck must be adjusted to the lowest when operating, and the pump truck must be turned off during the disassembly process.

Our-warehouse1

Our-warehouse1

Pack and ship

Pack and ship

Product detail pictures:

Chinese wholesale  Hyundai R290lc-7 Hydraulic Pump  - piston for concrete pump spare parts – CCMIC detail pictures

Chinese wholesale  Hyundai R290lc-7 Hydraulic Pump  - piston for concrete pump spare parts – CCMIC detail pictures


Related Product Guide:

Well-run gear, qualified revenue workforce, and superior after-sales companies; We've been also a unified huge loved ones, anyone persist with the organization benefit "unification, determination, tolerance" for Chinese wholesale Hyundai R290lc-7 Hydraulic Pump - piston for concrete pump spare parts – CCMIC , The product will supply to all over the world, such as: Oman, Lithuania, Spain, For more than ten years experience in this filed, our company has gained high reputation from home and abroad. So we welcome friends from all over the world to come and contact us, not only for business, but also for friendship.
Sales manager is very enthusiastic and professional, gave us a great concessions and product quality is very good,thank you very much!
5 Stars By Heloise from Paraguay - 2018.06.26 19:27
High Quality, High Efficiency, Creative and Integrity, worth having long-term cooperation! Looking forward to the future cooperation!
5 Stars By Joa from California - 2018.10.31 10:02
Write your message here and send it to us