Factory Cheap Hot Solar 55 Hydraulic Pump - discharge port for concrete pump spare parts – CCMIC

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

"Sincerity, Innovation, Rigorousness, and Efficiency" may be the persistent conception of our organization for that long-term to establish jointly with customers for mutual reciprocity and mutual gain for Komatsu Excavator Relief Valve, Foton Parts Supplier, Volvo Excavator Hydraulic Pump, We have been wanting forwards to creating long-term company interactions with around the world shoppers.
Factory Cheap Hot Solar 55 Hydraulic Pump - discharge port for concrete pump spare parts – CCMIC Detail:

discharge port

Because there are many kinds of spare parts, we can’t display them all on the website. Please feel free to contact us for specific ones

Advantage

1. We supply both original and aftermarket products for you
2. From the manufacturer to the customer directly, saving your cost
3. Stable stock for normal parts
4. In Time Delivery Time, with competitive shipping cost
5. Professional and on time after service

Packing  

Carton Boxes, or according to clients’ request.

description

How to correctly judge if the discharge port is blocked

In the normal construction process, if the discharge port is suddenly blocked, it can be judged by the following phenomena: The concrete feeding of the concrete pump stops running and is accompanied by obvious sound changes and violent vibrations. At this time, the concrete pump is conveying There is no vibration in the pipeline. If the staff finds the above phenomenon, then they can draw a definite conclusion: the discharge port is blocked.

How to deal with the discharge port being blocked by concrete

Once the concrete pump is blocked, the operator can immediately take the following measures to restore the pump to its normal state: quickly fill the hopper with cement slurry, then jog to control the reverse operation of the concrete pump, and then electrically control the forward operation of the concrete pump. Repeat several times until the pipeline is unblocked. If the pipeline is still not unblocked at this time, the worker can disassemble the outlet connecting pipe, remove the debris that blocks the pipeline, restore the pipeline, and finally start the concrete pump.

When the staff inspects the pump in operation, they can check the size of the load by looking at the motor current of the concrete pump. As the load of the concrete pump increases, the motor current will increase. As the load decreases, the motor current will decrease. The change of the motor current is a true reflection of the load change of the concrete pump, and it is very simple and effective to check.

Our-warehouse1

Our-warehouse1

Pack and ship

Pack and ship

Product detail pictures:

Factory Cheap Hot  Solar 55 Hydraulic Pump  - discharge port for concrete pump spare parts – CCMIC detail pictures

Factory Cheap Hot  Solar 55 Hydraulic Pump  - discharge port for concrete pump spare parts – CCMIC detail pictures


Related Product Guide:

We've got quite possibly the most state-of-the-art production gear, experienced and qualified engineers and workers, acknowledged top quality handle systems along with a friendly expert gross sales group pre/after-sales support for Factory Cheap Hot Solar 55 Hydraulic Pump - discharge port for concrete pump spare parts – CCMIC , The product will supply to all over the world, such as: Turkey, Argentina, Malaysia, We adhere to client 1st, top quality 1st, continuous improvement, mutual advantage and win-win principles. When cooperation together with the customer, we provide shoppers with the highest high-quality of service. Established good business relations using the Zimbabwe buyer inside the business, we've got established own brand and reputation. At the identical time, wholeheartedly welcome new and old prospects to our company to go to and negotiate small business.
In our cooperated wholesalers, this company has the best quality and reasonable price, they are our first choice.
5 Stars By Ada from United States - 2017.12.02 14:11
We have worked with many companies, but this time is the best,detailed explanation, timely delivery and quality qualified, nice!
5 Stars By Novia from Lisbon - 2017.09.09 10:18
Write your message here and send it to us