Low price for Jmc Spare Parts - Backhoe attachment for Skid steer loader Auxiliary tools – CCMIC
Low price for Jmc Spare Parts - Backhoe attachment for Skid steer loader Auxiliary tools – CCMIC Detail:
backhoe attachment
Because there are many kinds of spare parts, we can’t display them all on the website. Please feel free to contact us for specific ones.
advantage
1. We supply both original and aftermarket products for you
2. From the manufacturer to the customer directly, saving your cost
3. Stable stock for normal parts
4. In Time Delivery Time, with competitive shipping cost
5. Professional and on time after service
packing
Carton Boxes, or according to clients’ request.
description
After the excavator enters the construction site, the driver should first observe the geology of the working surface and the surrounding environment. There should be no obstacles within the excavator’s radius of rotation to avoid scratches or damage to the vehicle.
After the machine is started, no one is allowed to stand in the bucket, on the shovel arm and on the crawler belt to ensure safe production.
During the work of the excavator, it is forbidden for any person to stay or walk within the radius of gyration or under the bucket. Non-drivers are not allowed to enter the driver’s cab to mess around, and must not bring training drivers to avoid damage to electrical equipment.
When the excavator is shifting, the driver should first observe and whistle, and then shift to avoid safety accidents caused by someone on the side of the machine. The position after shifting must ensure that the excavator’s rotation radius is free of any obstacles, and illegal operations are strictly prohibited.
After the work is over, move the excavator away from the low-lying place or the edge of the trench (ditch), park it on the flat ground, close the doors and windows and lock them.
Specifications
Item | Unit | |
Bucket width | mm | 380 |
Bucket capacity | M³ | 0.06 |
Maximum digging depth | mm | 2400 |
Maximum working height | mm | 2980 |
Loading height | mm | 1910 |
Boom angle | ° | 120 |
Length | Mm | 2280 |
width | mm | 2200 |
Height | mm | 2090 |
Weight | kg | 780 |
Work pressure | Mpa | 16 |
Our-warehouse1
Pack and ship
Product detail pictures:
Related Product Guide:
Quality comes first; service is foremost; business is cooperation" is our business philosophy which is constantly observed and pursued by our company for Low price for Jmc Spare Parts - Backhoe attachment for Skid steer loader Auxiliary tools – CCMIC , The product will supply to all over the world, such as: Johannesburg, French, Bangkok, We always insist on the management tenet of "Quality is first, Technology is basis, Honesty and Innovation".We are able to develop new products continuously to a higher level to satisfy different needs of customers.
- Aerial Boom Lift
- China Dump Truck
- Cold Recycler
- Cone Crusher Liner
- Container Side Lifter
- Dadi Bulldozer Part
- Forklift Sweeper Attachment
- Hbxg Bulldozer Parts
- Howo Engine Parts
- Hyundai Excavator Hydraulic Pump
- Komatsu Bulldozer Parts
- Komatsu Excavator Gear Shaft
- Komatsu Pc300-7 Excavator Hydraulic Pump
- Liugong Bulldozer Parts
- Sany Concrete Pump Spare Parts
- Sany Excavator Spare Parts
- Shacman Engine Parts
- Shantui Bulldozer Clutch Shaft
- Shantui Bulldozer Connecting Shaft Pin
- Shantui Bulldozer Control Flexible Shaft
- Shantui Bulldozer Flexible Shaft
- Shantui Bulldozer Lifting Cylinder Repair Kit
- Shantui Bulldozer Parts
- Shantui Bulldozer Reel Shaft
- Shantui Bulldozer Reverse Gear Shaft
- Shantui Bulldozer Spare Parts
- Shantui Bulldozer Winch Drive Shaft
- Shantui Dozer Bolt
- Shantui Dozer Front Idler
- Shantui Dozer Tilt Cylinder Repair Kit
- Shantui Sd16 Bevel Gear
- Shantui Sd16 Brake Lining
- Shantui Sd16 Door Assembly
- Shantui Sd16 O-Ring
- Shantui Sd16 Track Roller
- Shantui Sd22 Bearing Sleeve
- Shantui Sd22 Friction Disc
- Shantui Sd32 Track Roller
- Sinotruk Engine Parts
- Tow Truck
- Xcmg Bulldozer Parts
- Xcmg Bulldozer Spare Parts
- Xcmg Hydraulic Lock
- Xcmg Transmission
- Yuchai Engine Parts
By Novia from Detroit - 2018.06.03 10:17
The sales manager is very patient, we communicated about three days before we decided to cooperate, finally, we are very satisfied with this cooperation!
By Edwina from Azerbaijan - 2017.11.20 15:58