Rotary reducer truck crane spare parts
Rotary reducer
Because there are many kinds of spare parts, we can’t display them all on the website. Please feel free to contact us for specific ones
Advantage
1. We supply both original and aftermarket products for you
2. From the manufacturer to the customer directly, saving your cost
3. Stable stock for normal parts
4. In Time Delivery Time, with competitive shipping cost
5. Professional and on time after service
Packing
Carton Boxes, or according to clients’ request.
description
Product Name | Rotary reducer |
Package | Carbon box |
Application | Truck crane |
condition | Brand new |
Brand Name | XCMG |
Certification | ISO/CE |
Minimum Order Quantity: |
1pcs |
Price: |
negotiation |
Payment Terms: |
T/T or western Union |
Supply Ability: |
10,000pcs per month |
Delivery Time: |
Usually 15 working days after received your payment, for stock parts, 3 days after receiving payment |
Packaging Details: |
Packed in carton firstly,and then reinforced with wooden case for outer packing
|
Maintain
①Clean the motor reducer. Remove the dust and sludge on the outside of the motor reducer base in time. If the environment is dusty, it is best to clean it once a day.
②Check and clean the wiring terminals of the motor reducer. Check whether the terminal screws of the junction box are loose or burnt.
③Check the screws of each fixed part, including anchor screws, end cover screws, bearing cover screws, etc. Tighten the loose nut.
④Check the transmission device, check whether the pulley or coupling is cracked or damaged, whether the installation is firm; whether the belt and its coupling buckle are intact.
⑤ For the starting equipment of the motor reducer, wipe the external dust and dirt in time, wipe the contacts, and check whether there are burn marks on the wiring parts and whether the grounding wire is good.
⑥ Inspection and maintenance of bearings. Bearings should be cleaned and replaced with grease or oil after a period of use. The time for cleaning and oil change should depend on the working conditions of the motor reducer, working environment, cleanliness, and lubricant types. Generally, it should be cleaned and re-greased every 3-6 months of work.
Our-warehouse1
Pack and ship
- Aerial Boom Lift
- China Dump Truck
- Cold Recycler
- Cone Crusher Liner
- Container Side Lifter
- Dadi Bulldozer Part
- Forklift Sweeper Attachment
- Hbxg Bulldozer Parts
- Howo Engine Parts
- Hyundai Excavator Hydraulic Pump
- Komatsu Bulldozer Parts
- Komatsu Excavator Gear Shaft
- Komatsu Pc300-7 Excavator Hydraulic Pump
- Liugong Bulldozer Parts
- Sany Concrete Pump Spare Parts
- Sany Excavator Spare Parts
- Shacman Engine Parts
- Shantui Bulldozer Clutch Shaft
- Shantui Bulldozer Connecting Shaft Pin
- Shantui Bulldozer Control Flexible Shaft
- Shantui Bulldozer Flexible Shaft
- Shantui Bulldozer Lifting Cylinder Repair Kit
- Shantui Bulldozer Parts
- Shantui Bulldozer Reel Shaft
- Shantui Bulldozer Reverse Gear Shaft
- Shantui Bulldozer Spare Parts
- Shantui Bulldozer Winch Drive Shaft
- Shantui Dozer Bolt
- Shantui Dozer Front Idler
- Shantui Dozer Tilt Cylinder Repair Kit
- Shantui Sd16 Bevel Gear
- Shantui Sd16 Brake Lining
- Shantui Sd16 Door Assembly
- Shantui Sd16 O-Ring
- Shantui Sd16 Track Roller
- Shantui Sd22 Bearing Sleeve
- Shantui Sd22 Friction Disc
- Shantui Sd32 Track Roller
- Sinotruk Engine Parts
- Tow Truck
- Xcmg Bulldozer Parts
- Xcmg Bulldozer Spare Parts
- Xcmg Hydraulic Lock
- Xcmg Transmission
- Yuchai Engine Parts