Shantui engine parts 113224 screw

Short Description:

Related product spare parts:

31Y-50A-01000 612630061027
31Y-40-04000 1000620630
31Y-30-00003 612630110734
31Y-82-00006 612600112610
31Y-82-00012 61000150094
31Y-18-06000 612630140046
16Y-63-13003 612630060997
31Y-79-00003 612600160039
31Y-30-00002 612640010075
16Y-62-50000CK 612600160182


Product Detail

Product Tags

description

Hydraulic pumps, piston pumps, plunger pumps to view

Excavator engine parts:
Crankshafts, connecting rods, pistons, cylinder liners, intake and exhaust valves, valve guides, overhaul kits, thrust plates, turbochargers, water pumps, oil pumps,  cylinder blocks, cylinder heads, thermostats and other genuine excavator engine accessories !

Original hydraulic parts of excavator:
Hydraulic pump and accessories, plunger, nine-hole plate, drive shaft (drive shaft) pilot pump, thrust plate, swing seat (swing assembly, swash plate), valve plate,  hydraulic plunger pump accessories, servo piston, hydraulic pump hydraulic parts such as the back cover!

Excavator hydraulic motor and accessories:
Travel motor assembly, swing motor assembly, travel reducer, swing reducer, gears,  bearings, hydraulic valves, multi-way valves, solenoid valves, main control valves,  safety valves and other pure excavator hydraulic parts! Cab parts, various types of  buckets, chassis parts, engine parts, hydraulic pumps and internal parts,  distribution valves, water tanks, diesel tanks, return transfer institutions, etc.

Due to too many types of spare parts, we cannot display them all on the website. Please feel free to contact us for specific information. The following are some other related product part numbers:

154-30-43110 Bracket (left)
154-30-43120 Bracket (right)
6691-21-4160 Pump drive gear
6691-21-4321 Idler
8190-MA-001463 Track shoe
16Y-62-50001 Dust ring
16Y-62-50008 KY circle
01011-52045 Bolt M20*145
16Y-02A-00038 Bearing shell
07000-62135 O-ring
148-80-01100 Cylinder bracket-SD16TL (left)
148-80-01200 Cylinder bracket-SD16TL (right)
01508-41006 Nut M10*1.25 left
07371-31049 Flange
01010-52070 Bolt M20*70
16Y-61-04000 Suction pipe
558ZS Shangchai 6121 fuel pump plunger
154-49-51420 Torque converter flange
23Y-74B-02000 Variable speed joint
22W-44-14580 Torque converter connector
3053393 SD22 chiller assembly
04077-00125 Retaining ring
04070-00130 Retaining ring
100-33-13120 spring
07012-10100 Skeleton oil seal

Our company also supplies the four-wheel area of ​​the chassis parts of bulldozers and excavators. The products are as follows:
(1) Shantui four-wheel area: Shantui guide wheel, Shantui drive wheel, Shantui support sprocket, Shantui drive wheel, Shantui tension, Shantui professional oil, Shantui sprocket tooth block, Shantui knife Angles, Shantui blades, Shantui construction machinery bolts, Shantui chain rails, Shantui track shoes, Shantui bucket teeth.
(2) Four-wheel belt: PC60. pc100. pc120, PC130. PC200, pc220. pC300. PC360. Pc400 series excavator driving wheels, guide wheels, tug wheels, driving teeth, tensioning devices, chains.
(3) Yuchai four-wheel area: Yuchai yc85 driving wheel, Yuchai yc85 supporting wheel, Yuchai yc85 tensioning device, Yuchai 55 guiding wheel, Yuchai yc55 driving wheel, Yuchai yc55 tensioning device.
(4) Kobelco four-wheel area: Kobelco sk200-3 driving wheel, Kobelco 200-6 supporting wheel, Kobelco 200-3 supporting wheel, Kobelco 200-6 driving wheel.
(5) Sumitomo four-wheel area: Sumitomo 120 driving wheels, Sumitomo 200 driving wheels, Sumitomo 200 supporting wheels.
(6) Carter’s four-wheel area: Carter driving wheels, Carter supporting wheels, Carter guiding wheels,
(7) Doosan four-wheel area: Doosan dh55 driving wheels, Doosan dh220 driving wheels, Doosan dh220 supporting wheels.
(8) Three-one four-wheel belt: Three-one sy130 supporting wheels, three-one sy130 driving wheels, three-one 300 supporting wheels, and three-one 300 driving wheels.
Please consult us for more details!

advantage

1. We supply both original and aftermarket products for you
2. From the manufacturer to the customer directly, saving your cost
3. Stable stock for normal parts
4. In Time Delivery Time, with competitive shipping cost
5. Professional and on time after service

packing

Carton Boxes, or according to clients’ request.

Our-warehouse1

Our-warehouse1

Pack and ship

Pack and ship

  • Previous:
  • Next:

  • Write your message here and send it to us