Water thermometer Shantui bulldozer spare parts

Short Description:

Applications

We can supply most of the Chinese brand. SHANTUI Bulldozer SD16 Water Thermometer, SHANTUI Bulldozer SD22 Water Thermometer, SHANTUI Bulldozer SD32 Water Thermometer.

HBXG Bulldozer SD7N Water Thermometer,HBXG Bulldozer T140 Water Thermometer, HBXG Bulldozer TY165 Water Thermometer , HBXG Bulldozer TY230 Water Thermometer, HBXG Bulldozer SD6N Water Thermometer, HBXG Bulldozer SD7N Water Thermometer, HBXG Bulldozer SD8N Water Thermometer, HBXG Bulldozer SD9N Water Thermometer.

XCMG Bulldozer TY160 Water Thermometer,XCMG Bulldozer TY230 Water Thermometer,XCMG Bulldozer TY320 Water Thermometer,SEM Bulldozer SEM816 Water Thermometer,SEM Bulldozer SEM822 Water Thermometer.

LIUGONG Bulldozer B110 Water Thermometer,LIUGONG Bulldozer B160 Water Thermometer,LIUGONG Bulldozer B230 Water Thermometer,LIUGONG Bulldozer B320 Water Thermometer,PENGPU Bulldozer PD140 Water Thermometer,PENGPU Bulldozer PD165 Water Thermometer,PENGPU Bulldozer PD220 Water Thermometer.

PENGPU Bulldozer PD320 Water Thermometer, PENGPU Bulldozer PD410 Water Thermometer, ZOOMLION Bulldozer ZD160 Water Thermometer,ZOOMLION Bulldozer ZD220 Water Thermometer,ZOOMLION Bulldozer ZD230 Water Thermometer, DADI Bulldozer MD32 Water Thermometer, DADI Bulldozer MD23 Water Thermometer, DADI Bulldozer MD23 Water Thermometer, DADI Bulldozer MD16 Water Thermometer.


Product Detail

Product Tags

 Water Thermometer

Because there are many kinds of spare parts, we can’t display them all on the website. Please feel free to contact us for specific ones

Advantage

1. We supply both original and aftermarket products for you
2. From the manufacturer to the customer directly, saving your cost
3. Stable stock for normal parts
4. In Time Delivery Time, with competitive shipping cost
5. Professional and on time after service

Packing

Carton Boxes, or according to clients’ request.

 

Shantui bulldozer preparation before operation

1. Wear safety helmets when entering and leaving the construction site. It is forbidden to wear slippers to work. It is strictly forbidden to drive after drinking. The engine should be inspected and prepared according to the diesel engine operating regulations.
2. Understand the topography and soil types of the work area, determine the dangerous point and the selected operation method.
3. If there are large rocks or large pits in the work area, they should be preselected to be removed or filled.
4. Before starting, all control levers should be placed in the “center” or “fixed” position.
5. The track of the crawler bulldozer should be moderately tight and even on the left and right. The tire pressure of the tire bulldozer must meet the requirements, and the tire pressure should be consistent.
6. Check the fuel oil, lubrication and cooling system, there should be no leakage, the cooling water should be enough, and the oil level should be normal.
7. When performing warranty or refueling, the engine must be turned off, the bulldozer blade and ripper must be lowered, and the brake lock lever must be in the “locked” position. Water temperature table
8. Check the electrical system, water temperature meter operating system and working devices, all parts must be in good working condition, adjust if necessary; check whether the instruments are normal.
9. The bulldozer with glue connection in the engine transmission part shall not be started by pushing and pulling with other machinery, so as not to damage the lock shaft.

 

Our-warehouse1

Our-warehouse1

Pack and ship

Pack and ship

  • Previous:
  • Next:

  • Write your message here and send it to us