Wholesale Price China Cat 325d Hydraulic Pump - discharge port for concrete pump spare parts – CCMIC

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

We have a professional, efficiency team to provide quality service for our customer. We always follow the tenet of customer-oriented, details-focused for Komatsu Excavator Relief Valve, Cat Excavator Hydraulic Pump, Xcmg Grader Spare Parts, We look forward to establish a long-term business relationship with your esteem co-operation.
Wholesale Price China Cat 325d Hydraulic Pump - discharge port for concrete pump spare parts – CCMIC Detail:

discharge port

Because there are many kinds of spare parts, we can’t display them all on the website. Please feel free to contact us for specific ones

Advantage

1. We supply both original and aftermarket products for you
2. From the manufacturer to the customer directly, saving your cost
3. Stable stock for normal parts
4. In Time Delivery Time, with competitive shipping cost
5. Professional and on time after service

Packing  

Carton Boxes, or according to clients’ request.

description

How to correctly judge if the discharge port is blocked

In the normal construction process, if the discharge port is suddenly blocked, it can be judged by the following phenomena: The concrete feeding of the concrete pump stops running and is accompanied by obvious sound changes and violent vibrations. At this time, the concrete pump is conveying There is no vibration in the pipeline. If the staff finds the above phenomenon, then they can draw a definite conclusion: the discharge port is blocked.

How to deal with the discharge port being blocked by concrete

Once the concrete pump is blocked, the operator can immediately take the following measures to restore the pump to its normal state: quickly fill the hopper with cement slurry, then jog to control the reverse operation of the concrete pump, and then electrically control the forward operation of the concrete pump. Repeat several times until the pipeline is unblocked. If the pipeline is still not unblocked at this time, the worker can disassemble the outlet connecting pipe, remove the debris that blocks the pipeline, restore the pipeline, and finally start the concrete pump.

When the staff inspects the pump in operation, they can check the size of the load by looking at the motor current of the concrete pump. As the load of the concrete pump increases, the motor current will increase. As the load decreases, the motor current will decrease. The change of the motor current is a true reflection of the load change of the concrete pump, and it is very simple and effective to check.

Our-warehouse1

Our-warehouse1

Pack and ship

Pack and ship

Product detail pictures:

Wholesale Price China  Cat 325d Hydraulic Pump  - discharge port for concrete pump spare parts – CCMIC detail pictures

Wholesale Price China  Cat 325d Hydraulic Pump  - discharge port for concrete pump spare parts – CCMIC detail pictures


Related Product Guide:

Generally customer-oriented, and it's our ultimate goal for being not only the most trusted, trustable and honest provider, but also the partner for our customers for Wholesale Price China Cat 325d Hydraulic Pump - discharge port for concrete pump spare parts – CCMIC , The product will supply to all over the world, such as: Jakarta, Roman, Iraq, Relying on superior quality and excellent post-sales, our products sell well in America, Europe, the Middle East and South Africa. We are also the appointed OEM factory for several worlds' famous products brands. Welcome to contact us for further negotiation and cooperation.
The factory technical staff gave us a lot of good advice in the cooperation process, this is very good, we are very grateful.
5 Stars By Judith from Puerto Rico - 2017.08.18 18:38
It can be said that this is a best producer we encountered in China in this industry, we feel lucky to work with so excellent manufacturer.
5 Stars By Yannick Vergoz from Qatar - 2017.05.21 12:31
Write your message here and send it to us